Basic Requirements List - BRL

This list of requirements is intended to be inherited by any system, and than improved according to functionalities.
:
Description
Metric
Unit
Minimum
Maximum
Name: Confiabilidade para 500 horas
Author: Celio/Celio
Version: 1.1
Module: de teste
IPS Element: Supply Support
Scope: SM
Description: 

Dependente da taxa de falhas.

Metric: Confiabilidade
Unit: %
Min: 98.123
Max: 99.876
Current:  98.124
     
Name: Maintenability for 2 hours
Author: Celio/Celio
Version: 1.1
Module: VHF 200
IPS Element: Technical Data
Scope: S
Description: 

Dependently on the design of the system

Metric: Maintenability
Unit: %
Min: 96.123
Max: 99.321
Current:  95.876
     
Name: Deployed Operation Requirements
Author: Abrahão/Abrahão
Version: 1.1
Module: Operations
IPS Element: Training and Training Support
Scope: SSM
Description: 

The system should be capable to operate from bases that are not the home base. In order to do that the following requirements apply:

- Transport requirements

- Containerization requirements

- AGE requirements

- Technical Data requirements

- Maintenance requirements

Metric: Availability
Unit: 
Min: 97.7
Max: 99.998
Current:  96.567
     
Name: 1st level on-aircraft operations support
Author: /De Mesquita
Version: 1.0
Module: Engine
IPS Element: Technical Data
Scope: S
Description: 

All aircraft must be supplied with all materials, equipment, systems, software, publications and supply to support operations for 1st level maintenance on-aircraft.

Metric: Supportability for 24h
Unit: %
Min: 95
Max: 98
Current:  0
     
Name: 
Author: /
Version: 
Module: 
IPS Element: ---
Scope: S
Description: 

Metric: 
Unit: 
Min: 0
Max: 0
Current:  0
     
Name: 
Author: /
Version: 
Module: 
IPS Element: ---
Scope: S
Description: 

Metric: 
Unit: 
Min: 0
Max: 0
Current:  0